EVALUASI KERJA POMPA DAN RANCANGAN SALURAN TERBUKA PADA TAMBANG BATUBARA DI UC-EAST PIT PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN

ASHADI, BUDI (2014) EVALUASI KERJA POMPA DAN RANCANGAN SALURAN TERBUKA PADA TAMBANG BATUBARA DI UC-EAST PIT PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
RINGKASAN.pdf

Download (11kB) | Preview
[img]
Preview
Text
ABSTRACT.pdf

Download (12kB) | Preview

Abstract

UC-East Pit merupakan bukaan tambang milik PT. Jorong Barutama Greston yang dikerjakan oleh PT. Borneo Alam Semesta sebagai kontraktor utama. Pit ini berlokasi di Desa Swarangan, Kecamatan Jorong, Kabupaten Tanah Laut, Provinsi Kalimantan Selatan. Dimana sistem yang diterapkan untuk penanganan masalah air adalah gabungan antara mine drainage yaitu upaya untuk mencegah air yang masuk kedalam area penambangan dan mine dewatering yaitu mengeluarkan air yang masuk kedalam daerah penambangan yaitu dengan cara membuat suatu saluran terbuka, sumuran, metode pemompaan dan kolam pengendapan. Pada UC-East Pit, sumber air yang masuk kedalam tambang berasal dari air hujan yang langsung masuk ke bukaan tambang dan air limpasan dari daerah tangkapan hujan di sekitar bukaan tambang. Saat ini belum ada rancangan saluran terbuka yang mendukung penambangan batubara di UC-East Pit pada tahun 2016 hingga tahun 2017. Berdasarkan analisis data curah hujan tahun 2004 – 2013, diperoleh curah hujan rencana adalah 139,22 mm/hari, intensitas curah hujan 48,26 mm/jam dengan periode ulang hujan 2 tahun dan resiko hidrologi sebesar 87,50 %. Luas total Daerah tangkapan hujan pada lokasi penelitian dibagi menjadi empat daerah tangkapan hujan, yaitu DTH I = 0,30 Km², DTH II = 0,82 Km², DTH III = 0,43 Km² dan DTH Kolam Pengendapan = 0,014 Km². Debit air hujan pada setiap DTH sebagai berikut: DTH I = 6.516 m³/jam, DTH II = 23.760 m³/jam, DTH III = 10.764 m³/jam dan DTH Kolam Pengendapan = 248,4 m³/jam. Untuk mencegah supaya air tidak masuk ke area penambangan maka di buat saluran terbuka di sekitar bukaan tambang. Kemudian untuk air yang masuk kedalam bukaan tambang UC-East Pit di alirkan secara alami kedalam sumuran. Dimensi saluran terbuka adalah sebagai berikut: Saluran I (utara UC-East Pit): a = 1,3 m; b = 1,2 m; B = 2,3 m; h = 1,2 m; d = 0,99 m. Saluran II (selatan UC-East Pit): a = 1,6 m; b = 1,4 m; B = 2,8 m; h = 1,4 m; d = 1,20 m. Dimensi sumuran adalah sebagai berikut: Volume = 37.573 m³; panjang permukaan = 113 m; lebar permukaan = 28 m; panjang dasar = 105 m; lebar dasar = 20 m; kedalaman = 7 m. Selanjutnya air pada sumuran dipompa menuju kolam pengendapan. Pompa yang digunakan adalah kombinasi dari pompa Multiflo MF420E dan Multiflo MF390. Kolam pengendapan terletak di timur laut UC-East Pit dan berdimensi panjang 25 m, lebar 15 m, dan kedalaman 3 m. sedangkan untuk pengerukan lumpur dilakukan setiap 63 hari atau 2 bulan sekali. UC-East Pit is opening a mine owned by PT. Jorong Barutama Greston done by PT. Borneo Alam Semesta as the main contractor. This pit is located in the village of Swarangan, District Jorong, Tanah Laut, South Kalimantan Province. Where the system is applied to the handling of the problem is a combination of mine drainage is an effort to prevent water from entering into the area of mining and mine dewatering which remove the water that goes into the mining area is by making an open drain, sump, pumping method and settling ponds. At UC-East Pit, a source of water that enters the mine comes from rain water directly into the mine openings and water run off from the catchment area the open pit. Currently there is no open channel design that supports the mining of coal mines in the UC-East Pit in 2016 and 2017. Based on the analysis of rainfall data in 2004 – 2013, rainfall was obtained plan is 139,22 mm/day, rainfall intensity 48,26 mm/hour with a 2 year return period rainfall and hydrological risks by 87,50 %. The total catchment area for rain is divided into four catchments, namely DTH I = 0,30 Km², DTH II = 0,82 Km², DTH III = 0,43 Km² and DTH Settling pond = 0,014 Km² . Debit rain at all catchment area is, DTH I = 6.516 m³/hour, DTH II = 23.760 m³/hour, DTH III = 10.764 m³/hour and DTH Settling pond = 248,4 m³/hour. To prevent that water does not get into the mining area in an open channel for around mine openings. Next to enter the open pit water UC-East Pit naturally discharged into the sump. Open channel dimensions are as follows: Channel I (North UC-East Pit) : a = 1,3 m; b = 1,2 m; B = 2,3 m; h = 1,2 m; d = 0,99 m. Channel II (South UC-East Pit) : a = 1,6 m; b = 1,4 m; B = 2,8 m; h = 1,4 m; d = 1,20 m. Sump dimensions are as follows: Volume = 37.573 m³; the length of surface = 113 m; the width of surface = 28 m; length of base = 105 m; width of base = 20 m; depth = 7m and then, the water in the sump is pumped into settling ponds. Pumps used is combinations from pump Multiflo MF420E and Multiflo MF390. Settling ponds located in UC-East Pit and the dimensionless length 25 m, width 15 m, and a depth of 3 m. whereas for mud dredging done every 63 days or 2 months.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 19 May 2016 07:26
Last Modified: 19 May 2016 07:26
URI: http://eprints.upnyk.ac.id/id/eprint/1709