EVALUASI KERJA POMPA DAN RANCANGAN SALURAN TERBUKA PADA TAMBANG BATUBARA DI UC-EAST PIT PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN

ASHADI, BUDI (2014) EVALUASI KERJA POMPA DAN RANCANGAN SALURAN TERBUKA PADA TAMBANG BATUBARA DI UC-EAST PIT PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of RINGKASAN.pdf]
Preview
Text
RINGKASAN.pdf

Download (11kB) | Preview
[thumbnail of ABSTRACT.pdf]
Preview
Text
ABSTRACT.pdf

Download (12kB) | Preview

Abstract

UC-East Pit merupakan bukaan tambang milik PT. Jorong Barutama
Greston yang dikerjakan oleh PT. Borneo Alam Semesta sebagai kontraktor
utama. Pit ini berlokasi di Desa Swarangan, Kecamatan Jorong, Kabupaten Tanah
Laut, Provinsi Kalimantan Selatan. Dimana sistem yang diterapkan untuk
penanganan masalah air adalah gabungan antara mine drainage yaitu upaya untuk
mencegah air yang masuk kedalam area penambangan dan mine dewatering yaitu
mengeluarkan air yang masuk kedalam daerah penambangan yaitu dengan cara
membuat suatu saluran terbuka, sumuran, metode pemompaan dan kolam
pengendapan. Pada UC-East Pit, sumber air yang masuk kedalam tambang
berasal dari air hujan yang langsung masuk ke bukaan tambang dan air limpasan
dari daerah tangkapan hujan di sekitar bukaan tambang. Saat ini belum ada
rancangan saluran terbuka yang mendukung penambangan batubara di UC-East
Pit pada tahun 2016 hingga tahun 2017.
Berdasarkan analisis data curah hujan tahun 2004 – 2013, diperoleh curah
hujan rencana adalah 139,22 mm/hari, intensitas curah hujan 48,26 mm/jam
dengan periode ulang hujan 2 tahun dan resiko hidrologi sebesar 87,50 %. Luas
total Daerah tangkapan hujan pada lokasi penelitian dibagi menjadi empat daerah
tangkapan hujan, yaitu DTH I = 0,30 Km², DTH II = 0,82 Km², DTH III = 0,43
Km² dan DTH Kolam Pengendapan = 0,014 Km². Debit air hujan pada setiap
DTH sebagai berikut: DTH I = 6.516 m³/jam, DTH II = 23.760 m³/jam, DTH III =
10.764 m³/jam dan DTH Kolam Pengendapan = 248,4 m³/jam.
Untuk mencegah supaya air tidak masuk ke area penambangan maka di
buat saluran terbuka di sekitar bukaan tambang. Kemudian untuk air yang masuk
kedalam bukaan tambang UC-East Pit di alirkan secara alami kedalam sumuran.
Dimensi saluran terbuka adalah sebagai berikut:
Saluran I
(utara UC-East Pit): a = 1,3 m; b = 1,2 m; B = 2,3 m; h = 1,2 m; d = 0,99 m.
Saluran II
(selatan UC-East Pit): a = 1,6 m; b = 1,4 m; B = 2,8 m; h = 1,4 m; d = 1,20 m.
Dimensi sumuran adalah sebagai berikut:
Volume = 37.573 m³; panjang permukaan = 113 m; lebar permukaan = 28 m;
panjang dasar = 105 m; lebar dasar = 20 m; kedalaman = 7 m.
Selanjutnya air pada sumuran dipompa menuju kolam pengendapan.
Pompa yang digunakan adalah kombinasi dari pompa Multiflo MF420E dan
Multiflo MF390. Kolam pengendapan terletak di timur laut UC-East Pit dan
berdimensi panjang 25 m, lebar 15 m, dan kedalaman 3 m. sedangkan untuk
pengerukan lumpur dilakukan setiap 63 hari atau 2 bulan sekali.

UC-East Pit is opening a mine owned by PT. Jorong Barutama Greston
done by PT. Borneo Alam Semesta as the main contractor. This pit is located in
the village of Swarangan, District Jorong, Tanah Laut, South Kalimantan
Province. Where the system is applied to the handling of the problem is a
combination of mine drainage is an effort to prevent water from entering into the
area of mining and mine dewatering which remove the water that goes into the
mining area is by making an open drain, sump, pumping method and settling
ponds. At UC-East Pit, a source of water that enters the mine comes from rain
water directly into the mine openings and water run off from the catchment area
the open pit. Currently there is no open channel design that supports the mining of
coal mines in the UC-East Pit in 2016 and 2017.
Based on the analysis of rainfall data in 2004 – 2013, rainfall was
obtained plan is 139,22 mm/day, rainfall intensity 48,26 mm/hour with a 2 year
return period rainfall and hydrological risks by 87,50 %. The total catchment
area for rain is divided into four catchments, namely DTH I = 0,30 Km², DTH II
= 0,82 Km², DTH III = 0,43 Km² and DTH Settling pond = 0,014 Km² . Debit
rain at all catchment area is, DTH I = 6.516 m³/hour, DTH II = 23.760 m³/hour,
DTH III = 10.764 m³/hour and DTH Settling pond = 248,4 m³/hour.
To prevent that water does not get into the mining area in an open channel
for around mine openings. Next to enter the open pit water UC-East Pit naturally
discharged into the sump. Open channel dimensions are as follows:
Channel I (North UC-East Pit) : a = 1,3 m; b = 1,2 m; B = 2,3 m; h = 1,2 m; d =
0,99 m.
Channel II (South UC-East Pit) : a = 1,6 m; b = 1,4 m; B = 2,8 m; h = 1,4 m; d =
1,20 m.
Sump dimensions are as follows:
Volume = 37.573 m³; the length of surface = 113 m; the width of surface = 28 m;
length of base = 105 m; width of base = 20 m; depth = 7m and then, the water in
the sump is pumped into settling ponds. Pumps used is combinations from pump
Multiflo MF420E and Multiflo MF390. Settling ponds located in UC-East Pit and
the dimensionless length 25 m, width 15 m, and a depth of 3 m. whereas for mud
dredging done every 63 days or 2 months.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 19 May 2016 07:26
Last Modified: 19 May 2016 07:26
URI: http://eprints.upnyk.ac.id/id/eprint/1709

Actions (login required)

View Item View Item