PENAKSIRAN SUMBERDAYA BATU ANDESIT METODE CROSS SECTION DAN METODE CONTOUR DI PT. BUMI KALIMASADA PERTAMBANGAN DESA KALIREJO, KECAMATAN KOKAP, KABUPATEN KULON PROGO, YOGYAKARTA

PERDANA, YANUAR PUTRA (2018) PENAKSIRAN SUMBERDAYA BATU ANDESIT METODE CROSS SECTION DAN METODE CONTOUR DI PT. BUMI KALIMASADA PERTAMBANGAN DESA KALIREJO, KECAMATAN KOKAP, KABUPATEN KULON PROGO, YOGYAKARTA. Other thesis, Univesitas Pembangunan Nasional "Veteran" Yogyakarta.

[img]
Preview
Text
2. ABSTRACT.pdf

Download (138kB) | Preview
[img]
Preview
Text
3. COVER - fix.pdf

Download (182kB) | Preview
[img]
Preview
Text
4. Pengesahan.pdf

Download (535kB) | Preview
[img]
Preview
Text
5. DAFTAR ISI sim sim.pdf

Download (87kB) | Preview

Abstract

PT. Bumi Kalimasada Mining is Company mine stones which is located in the village of Kalirejo, district Kokap, Kulon Progo. PT. Bumi Kalimasada Mining is still under construction, so did the valuation of the andesite stones with the method of Cross Section and method of Contour, as input for the company. Research area around 49,15 hectares. Resource assessment method used is the method of Cross Section and method of Contour. The reason the use of both of these methods because the stones have a high level of its homogeneity and has simple geometric shapes. The method of Cross Section which done in the study had the distance between the incision. This is due to the condition of the topography of the area of research has a different degree of steepness. Resource estimation results of the stones: The Method Of Cross Section. • North – South: 36.320.620 m3 • West – East: 35.804.928 m3 Contour Metho: 37.085.253 m3 The results of the valuation of the stones resources used to find the accuracy based on the percent error. The method of Cross Section incision direction West-East has the percent error of 0,90%, which means it has the accuracy rate of 99,10%. The method of Cross Section a North-South direction of the incision has a percent error of 0,61%, which means it has the accuracy level of 99,39%. And the method of Contour have a percent error of 0,10%, which means it has the level of accuracy of 99,90%. Method of Contour better when compared with the method of Cross Section because it has higher accuracy with the percentage accuracy of 99,90%, on the distance between the elevation of 12 meters with resource assessment results of andesite 37.085.253 m3.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eny Suparny
Date Deposited: 13 Aug 2018 04:40
Last Modified: 13 Aug 2018 04:40
URI: http://eprints.upnyk.ac.id/id/eprint/16125

Actions (login required)

View Item View Item