STUDI KELAYAKAN USAHA PENAMBANGAN TANAH URUG DI DESA KARANGLEWAS KECAMATAN JATILAWANG KABUPATEN BANYUMAS JAWA TENGAH

Perdani, Louise Indy Senja (2018) STUDI KELAYAKAN USAHA PENAMBANGAN TANAH URUG DI DESA KARANGLEWAS KECAMATAN JATILAWANG KABUPATEN BANYUMAS JAWA TENGAH. Other thesis, Universitas Pembangunan Nasional "Veteran" Yogyakarta.

[img]
Preview
Text
cover .pdf

Download (75kB) | Preview
[img]
Preview
Text
Lembar Pengesahan.pdf

Download (74kB) | Preview
[img]
Preview
Text
Abstract.pdf

Download (71kB) | Preview
[img]
Preview
Text
daftar isi.pdf

Download (68kB) | Preview

Abstract

Abstract The increasing number infrastructure development and housing development on Jatilawang Subdistricts and the surrounding areas needs more backfill soil. However, on Jatilawang subdistricts there isn’t backfill soil mining. Therefore there is someone thats makes the backfill soil mining on Karanglewas, Jatilawang Subdistrict and it development will going 5 (five) years after administration or feasibility study finish. The existence backfill soil mining will fulfill demand of backsoil on Jatilawang Subdistrict. Feasibility Study on the backfill soil mining on Karanglewas Village will covering whole technicasl aspects, market and marketing aspects, social, economic and environmental aspects, and financial aspect it proper for either mined or continue. Looking for financial. Judging from financial aspects with Net Present Value (NPV) methods shows the value more than 0 that is Rp 838.732.139,45 which is therefore from Net Present Value (NPV) criteria it is proper for development. The methods Internal Rate of Return (IRR) obtained from interest 48%, it value greater than it minimum which is 17%. Thus, this IRR criteria proper and will provide relatively big profit. Payback period methods shows overview about the estimated time of payback that will invested for 0.2 years. A sensitivity analysis where a 17.9% decline in benefits over cost forecasts could lead to NPV to 0, meaning that the project is very sensitive to changes in the estimated benefit (price). Whereas, a decrease of cost (cost) of 15.5% above the estimated cost will cause the NPV to 0, meaning that the project is very sensitive to changes in the estimated cost (cost). Keywords : Net Present Value, Internal Rate of Return, Pay back period and Sensitivity Analysis.

Item Type: Thesis (Other)
Subjects: H Social Sciences > H Social Sciences (General)
Divisions: Faculty of Law, Arts and Social Sciences > School of Social Sciences
Depositing User: Basir Umaryadi
Date Deposited: 30 Jul 2018 02:55
Last Modified: 30 Jul 2018 02:55
URI: http://eprints.upnyk.ac.id/id/eprint/15880

Actions (login required)

View Item View Item