HUDA, KHOIRUL (2014) KAJIAN KINERJA OPERASI PELEDAKAN PADA KUARI BATUGAMPING DI PT. SEMEN INDONESIA (PERSERO) Tbk. PABRIK TUBAN JAWA TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
abstrak.pdf Download (25kB) | Preview |
Abstract
Penambangan batugamping di Kuari Pongpongan dan Temandang PT. Semen
Indonesia (Persero) Tbk, pabrik Tuban Jawa Timur dilakukan dengan cara
pengeboran dan peledakan. Kegiatan penambangan batugamping dilaksanakan oleh
anak perusahaannya yaitu PT. United Tractors Semen Gresik (PT. UTsg).
Pada pengamatan yang dilakukan di lapangan ditemukan adanya masalah
yang berhubungan dengan target produksi dan ukuran fragmentasi hasil peledakan.
Target produksi pembongkaran batugamping tahun 2013 yaitu sebesar 13.900.000
ton/tahun atau 56.504,07 ton/hari yang dilakukan dengan pengeboran dan peledakan
belum terpenuhi. Target ukuran fragmentasi hasil peledakan adalah ≤ 80 cm dengan
ukuran bongkah atau boulder (> 80 cm) kurang dari 15 %, namun kenyataannya
ukuran fragmentasi hasil peledakan masih menghasilkan boulder dengan persentasi
rata – rata sebesar 23,73 %.
Tidak tercapainya target produksi serta ukuran fragmentasi yang diinginkan,
disebabkan oleh kegiatan peledakan yang belum memenuhi kriteria peledakan yang
baik (S. Koesnaryo, 2001). Oleh karena itu, perlu adanya perbaikan dalam kegiatan
peledakan meliputi penggunaan bahan peledak atau powder factor (PF), serta usulan
rancangan teknis geometri peledakan yang diterapkan saat ini.
Dengan merubah faktor-faktor penyebab ukuran fragmentasi yang tidak
tercapai sesuai analisa di lapangan, menggunakan teori C.J. Konya dan Kuznetsov
yaitu dengan merubah geometri peledakan dengan burden sebesar 2,6 m, spacing
sebesar 3,3 m, stemming sebesar 1,80 m, subdrilling sebesar 0,5 m, kedalaman
lubang bor 8,5 m dengan nilai powder factor 0,46 kg/m3 didapatkan ukuran boulder
Limestone mining in Quarry Pongpongan Temandang PT. Semen Indonesia
(Persero) Tbk, Tuban, East Java is carried by drilling-blasting methods. Limestone
mining activities carried out by its subsidiary PT. United Tractors Semen Gresik (PT
UTsg).
On observations made in the field found the problems associated with target
of production and fragmentation size blasting results. In 2013, the company targeted
to explore limestones of 13.9 million tons/year or 56.504,07 tons/day was carried out
using drilling-blasting methods, but from the observation and calculation of the site
production target has failure. Target average fragmentation is ≤ 80 cm with boulder
(> 80 cm) less more 15 %, but the fact the average fragmentation size from the
explosion still found the boulder with a percentage average of 23,73%.
Failure to achieve the desired target of production and size fragmentation,
caused by the blasting methods has not been meet criteria of a good blasting (S.
Koesnaryo, 2001). Therefore, the need for adjustment of the use of explosives or
powder factor (PF), and the proposed technical design geometry blasting the
applied current.
By changing the size of the underlying factors are not achieved according
fragmentation analysis in the field, using the theory of C.J. Konya and Kuznetsov is
changing blasting geometry with borehole diameter 3,5 inches (88,9 mm), the burden
was 2,6 m, the spacing was 3,3 m, the stemming was 1,80 m, the subdrilling was 0,5
m, the depth of drill hole was 8,5 m with a powder factor 0.46 kg/m3 results size of
boulder was 8,076%.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 19 May 2016 01:02 |
Last Modified: | 19 May 2016 01:02 |
URI: | http://eprints.upnyk.ac.id/id/eprint/1575 |
Actions (login required)
![]() |
View Item |