STRESS DISTRIBUTION AND DISPLACEMENT ANALYSIS IN A STOPE IN PONGKOR UNDERGROUND GOLD MINE

SULAIMAN, M. Safrudin and SULISTIANTO, Budi and WATTIMENA, Ridho K. and KRAMADIBRATA, Suseno and DWINAGARA, Barlian and MATSUI, Kikuo and SETIAWAN, Iwan Dharma (2006) STRESS DISTRIBUTION AND DISPLACEMENT ANALYSIS IN A STOPE IN PONGKOR UNDERGROUND GOLD MINE. 4th INTERNATIONAL WORKSHOP ON EARTH SCIENCE AND TECHNOLOGI. pp. 91-98. ISSN 978-4-9902356-7-3

[img]
Preview
Text
No. 26 Abstrak.pdf

Download (793kB) | Preview
[img]
Preview
Text
No. 26 International Workshop.pdf

Download (11MB) | Preview

Abstract

Pongkor is one of the underground gold mines in Indonesia which applies the cut and fill mining method. During the mining, the stability of mine opening is one of the factors deciding the continuity of underground mining process. Due to mining activity, stresses around the mining area will be redistributed, and in some condition they may lead to a failure on the stope. To avoid such failure, it is important to monitor the deformation and understand the stress redistribution effects on surrounding rock mass as the mining activity proceeded. A borehole extensometer was installed in the ore body to monitor the rock mass displacement, and a 3D model of the mining sequence was made to understand the stress redistribution in the surrounding rock mass.

Item Type: Article
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: BARLIAN DWI NAGARA
Date Deposited: 10 Jan 2018 03:20
Last Modified: 10 Jan 2018 03:20
URI: http://eprints.upnyk.ac.id/id/eprint/14088

Actions (login required)

View Item View Item