Rancangan Multi Pit Penambangan Batubara

BARGAWA, Waterman Sulistyana and SIRI, Hasywir Thaib and WIDYANTO, Dewa (2008) Rancangan Multi Pit Penambangan Batubara. Prosiding Temu Profesi Tahunan (TPT) XVII PERHAPI 2008 Tema: Pengembangan Proses, Teknologi dan Profesionalisme Menuju Keberlanjutan Pertambangan. pp. 323-330. ISSN 978-979-8826-14-6

[img]
Preview
Text
Rancangan_Multi_Pit_Penambangan_Batubara.pdf

Download (4MB) | Preview

Abstract

The development of coal prospecting areas requires good mining design, and is directed in order to meet production target. The research location in this paper is located in the North Barito District of Central Kalimantan Province. Based on geotechnical study can be obtained geometry of mining end slope, where the height of individual bench 6m, width 2m, face angle of 60o, overall slope of 37-45o. Based on the concept of multi pit, panel and strip strategy, the coal reserves estimate on the southern block is 1,800,000 tons. The main equipment of the mine is bulldozer Komatsu D 65 E, backhoe (excavator) Komatsu PC 400-6, dump truckKomatsu HD 255-5

Item Type: Article
Subjects: Q Science > QE Geology
Divisions: Faculty of Engineering, Science and Mathematics > School of Mathematics
Depositing User: Dr.Ir.MT WATERMAN BARGAWAN SULISTYANA
Date Deposited: 13 Oct 2017 08:34
Last Modified: 13 Oct 2017 08:34
URI: http://eprints.upnyk.ac.id/id/eprint/13212

Actions (login required)

View Item View Item