KAJIAN TEKNIS PENERAPAN KOLAM PENAMPUNGAN DAN POMPA UNTUK PELONGSORAN TIMBUNAN TANAH PENUTUP PADA BUKAAN TAMBANG PIT INUL MIDDLE PT. KALTIM PRIMA COAL, KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR

FARIDAWATI, FARIDAWATI (2017) KAJIAN TEKNIS PENERAPAN KOLAM PENAMPUNGAN DAN POMPA UNTUK PELONGSORAN TIMBUNAN TANAH PENUTUP PADA BUKAAN TAMBANG PIT INUL MIDDLE PT. KALTIM PRIMA COAL, KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of ABSTRACT.pdf]
Preview
Text
ABSTRACT.pdf

Download (69kB) | Preview
[thumbnail of COVER.pdf]
Preview
Text
COVER.pdf

Download (197kB) | Preview
[thumbnail of DAFTAR ISI.pdf]
Preview
Text
DAFTAR ISI.pdf

Download (14kB) | Preview
[thumbnail of Lembar Pengesahan.pdf]
Preview
Text
Lembar Pengesahan.pdf

Download (448kB) | Preview
[thumbnail of daftar pustaka.pdf] Text
daftar pustaka.pdf

Download (11kB)

Abstract

PT. Kaltim Prima Coal is located in Sangata sub-district, Kutai Timur regency, Kalimantan Timur Province. PT. Kaltim Prima Coal is a coal mine company that applies strip mine method for the coal mining process.
In accordance with the stages of mining activity the deeper the mining activity goes, the further the hauling distance become. PT. Kaltim Prima Coal will do something in order to cut down the hauling distance.
The solution to cut down the hauling distance are embankment slope failing and making a pond in the crest dumping area. The pond is made to hold the water so it can be used to saturate the soil so the slope will fail. The pond’s dimension are 2 m on the bottom surface area, 6 m on the top surface area and 5 m on height.
Water is the media that used in the slope failing activities. The water come from K-West well with 0,19 m3/second flow. To canalize the water in to the pond, pump and pipe are being used. After the pond is filled by the water, the pump will be shut down and the slope movement will be monitored by slope stability radar.
Based on the slope stability radar, the slope movement is classified as slow category because the average of slope movement is only 1.5 m/month.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 11 Apr 2017 02:49
Last Modified: 18 Dec 2023 04:49
URI: http://eprints.upnyk.ac.id/id/eprint/11781

Actions (login required)

View Item View Item