RENCANA BIAYA REKLAMASI PROGRAM PASCATAMBANG LAHAN BEKAS TAMBANG PASIR KUARSA DI PT TRI PANORAMA SETIA KECAMATAN KIJANG KABUPATEN BINTAN PROVINSI KEPULAUAN RIAU

ABADI, MOCHAMMAD RIFKY (2017) RENCANA BIAYA REKLAMASI PROGRAM PASCATAMBANG LAHAN BEKAS TAMBANG PASIR KUARSA DI PT TRI PANORAMA SETIA KECAMATAN KIJANG KABUPATEN BINTAN PROVINSI KEPULAUAN RIAU. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of cover.pdf]
Preview
Text
cover.pdf

Download (65kB) | Preview
[thumbnail of lembar pengesahan.pdf]
Preview
Text
lembar pengesahan.pdf

Download (668kB) | Preview
[thumbnail of abstrak.pdf]
Preview
Text
abstrak.pdf

Download (5kB) | Preview
[thumbnail of DAFTAR ISI .pdf]
Preview
Text
DAFTAR ISI .pdf

Download (9kB) | Preview

Abstract

ABSTRACT
PT Tri Panorama Setia is quartz sand mining companies located in the
village of Gunung Kijang, District Gunung Kijang, Bintan regency, Riau Islands
Province. Mining activities in the company that produces quartz sand began in
2016 and completed in 2020. The termination of mining activities resulted in
negative impacts, especially environmental damage so that need cost plans postmining
reclamation. It purposes to know how much the cost to reduce the negative
impact of mining activities.
The purpose of this study was to calculate the cost of demolition,
performed land use, dissemination of topsoil and revegetation in the post minereclamation
activities of PT Tri Panorama Setia. The method used in this study
generally consists of a literature study to determine the general picture and add
references to post-mining, collecting supporting data such as guidelines for the
planning of post-mining based on the law, secondary data collection on an
overview of the area of research, data collection in the field to determine the
profile the area to be reclaimed post-mining program, and calculate the plan and
the cost of post-mining reclamation program.
Cost plans post-mining reclamation of mined land program quartz sand
PT Tri Panorama Setia will do in three areas: the former mine site, processing
facilities, and support facilities starting from the demolition of the building, then
performed land use, and dissemination of topsoil. After that, the planting of cover
crops and planting of pioneer. Total budget plan program post-mining reclamation
costs amounted Rp234,494,342.00.

Item Type: Thesis (Other)
Subjek: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basir Umaryadi
Date Deposited: 27 Feb 2017 08:47
Last Modified: 27 Feb 2017 08:47
URI: http://eprints.upnyk.ac.id/id/eprint/11447