OPTIMASI JADWAL PERAWATAN PENCEGAHAN UNTUK MEMINIMASI BIAYA TOTAL PERAWATAN MESIN PEMBANGKIT LISTRIK TENAGA DIESEL (Studi kasus di PUSDIKLAT MIGAS CEPU)

Ullynanti Yunani, Cita (2016) OPTIMASI JADWAL PERAWATAN PENCEGAHAN UNTUK MEMINIMASI BIAYA TOTAL PERAWATAN MESIN PEMBANGKIT LISTRIK TENAGA DIESEL (Studi kasus di PUSDIKLAT MIGAS CEPU). Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 1. Cover.pdf]
Preview
Text
1. Cover.pdf

Download (155kB) | Preview
[thumbnail of 7. ABSTRAK.pdf]
Preview
Text
7. ABSTRAK.pdf

Download (39kB) | Preview
[thumbnail of 2.LEMBAR PENGESAHAN.pdf]
Preview
Text
2.LEMBAR PENGESAHAN.pdf

Download (31kB) | Preview
[thumbnail of 4. DAFTAR ISI.pdf]
Preview
Text
4. DAFTAR ISI.pdf

Download (33kB) | Preview

Abstract

Pusdiklat Migas Cepu merupakan suatu institusi kedinasan yang bertujuan untuk meningkatkan pengetahuan, keterampilan, dan sikap perilaku
bagi tenaga kerja di lingkungannya, terutama dalam dunia perminyakan dan gas
bumi. Penelitian di fokuskan di unit power plant pada diesel engine.
Permasalahan yang dihadapi belum melakukan perawatan secara terjadwal yang
mengakibatkan nozzle rusak, filter oli dan cooler bocor. Adanya permasalahan
tersebut diharapkan perusahaan melakukan perawatan secara terjadwal agar
terhindar dari breakdown maintenance yang dapat mengakibatkan
pembengkakan biaya perawatan.
Untuk mengatasi permasalahan tersebut, salah satu metode yang
digunakan dengan menggunakan distribusi Weibull sehingga dapat diperoleh
total biaya terendah dan waktu perawatan. Diharapkan dapat menguntungkan
pihak Pusdiklat Migas Cepu dan terhindar dari breakdown maintenance
Hasil selang waktu perawatan yang lebih baik yaitu 76 jam dengan total
ongkos total perawatan sebesar Rp 4.097/jam dan ini merupakan total biaya
terendah dibandingkan dengan pedoman selang waktu perawatan yang di
lakukan Pusdiklat Migas 100 jam dengan total ongkos total perawatan sebesar
Rp 16.252/jam dan pada Mannual Book 90 jam dengan ongkos total perawatan
sebesar Rp 7.109/jam. Sehingga dari perbandingan tersebut dapat diketahui
bahwa dengan melakukan penjadwalan yang baik biaya perbaikan dapat
diminalisir. Pada penjadwalan yang baru perawatan mesin diesel memberikan
ongkos perbaikan yang jauh lebih kecil.

Kata kunci : diesel engine, jadwal perawatan, biaya perawatan, distribusi
Weibull









x
ABSTRACT

Cepu Oil and Gas Training Center is an official institution that aims to
improve the knowledge, skills and attitudes for employment behavior in the
environment, particularly in the oil and natural gas. The study focused on power
plant units on diesel engines. The problem faced not perform unscheduled
maintenance resulting in broken nozzle, oil filter and cooler leak. The existence of
these problems expected the company to perform maintenance on a scheduled
basis to avoid the breakdown maintenance that can result in swelling of the cost
of care.
To solve these problems, one method used the Weibull distribution so as
to obtain the lowest total cost and maintenance time. Expected to benefit the
migas Migas Cepu and protected from breakdown maintenance.
Following the processing data and analysis of the results using the
Weibull distribution results obtained treatment interval is 76 hours for a total cost
of total care costs Rp 4,097 / hour and is the lowest total cost compared to the
time interval guidelines do maintenance in the Oil and Gas Training Center with
a total of 100 hours of total treatment costs Rp 16 252 / hour and at Mannual
Book 90 hours with a total cost of treatment of Rp 7,109 / hour. So, from this
comparison can be seen that by doing good scheduling repair costs can be
minimize. In scheduling the new diesel engine maintenance provides repair costs
are much smaller.

Keywords: diesel engine, maintenance schedules, maintenance costs, Weibull
distribution

Item Type: Thesis (Other)
Subjek: H Social Sciences > HD Industries. Land use. Labor
Divisions: x. Faculty of Law, Arts and Social Sciences > School of Social Sciences
Depositing User: Eko Yuli
Date Deposited: 17 May 2016 01:31
Last Modified: 18 May 2016 00:40
URI: http://eprints.upnyk.ac.id/id/eprint/1071

Actions (login required)

View Item View Item