Abstract
vi
ABSTRACT
PT. Gunung Emas Abadi is a company which moved in coal mining business
located at Lalap, Petangkep Tutui District, Municipitaly east Barito, central
Kalimantan province.
Mining activity were implemented by PT.Gunung Emas Abadai is a system of
surface mining with method open cut. In the excavating overburden using a series of
work loading equipment and hauling equipment, to move the material from the
loading site to the dumping area. The excavating used for digging and loading
material into dump truck and then hauling material at the dumping area front 1
626,89 m and front 2 with distance area 668,93 m.
The equipment are used is backhoe Volvo EC 480 DL that having a capacity of
3,3 m³ bucket and equipment hauling whiches used dump trucks Nissan CWB45 with
vessel capacity 22 m³. production overburden target is 118.600,00 BCM/Month. The
problem that occur this time is the production of dump truck I not optimal yet, so the
production that set on target was not yet reaches. The real overburden production is
111.479,20 BCM/Month. Production target is not achieving to the lost work time of
delay time work, which delay time or idle time. With the delay time will be reduce the
effective working time so that causing effesien working little being.efforts are being
made increase production using increase work efficiency and reduce of the cycle time
hauling equipment.
By reducing cycle time Hauling Equipment on front 1 from 11.14 minutes to
9.61 minutes, while the front 2 of 11.20 minutes to 9.97 minutes and controllable
delay time, will cause the improvement of work effectiveness. Excavator Volvo EC
480 DL(EX-4035) effectiveness improve from 73,30 % to 74,21 %, for excavator
Volvo EC 480 DL(EX-4037) dari 73,14 % to 74,45 %, and Dump Truck Nissan
CWB45(EX-4035) improve from 69,28 % to 71 %, for Dump Truck Nissan
CWB45(EX-4037) dari 69,36 % to 70,59 %. Before The Production enhancement
111.479,20 Bcm/month and The Production after that is equal to
129.941,65 Bcm/month.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > T Technology (General) |
Divisions: | x. Eprints Lama > 4 |
Depositing User: | Sarimin Sarimin |
Date Deposited: | 04 Jan 2017 01:16 |
Last Modified: | 04 Jan 2017 01:16 |
URI: | http://eprints.upnyk.ac.id/id/eprint/10411 |
Actions (login required)
![]() |
View Item |